AREVA ( back to the Home Page )

Log in
This page allows you to manage all your electronic subscriptions on this site.
Register
Suscribe to the AREVA dashboard give you an access to newsletters, news, and email alerts from the Dialogue section...

Weekly report : from November 4th to 9th, 1999

Press release

November 10, 1999

At the UP2 plant, shearing of fuel elements from a batch of EDF 1300 MWe fuel continued in the R1 head-end facility. A total of 750 metric tons of uranium have been sheared to date this year.

At the R7 vitrification facility, line A is in operation; lines B and C are on stand-by. 7 canisters of glass were produced this week. A total of 199 canisters of glass have been produced to date this year.

At the UP3 plant, shearing of fuel elements from OHI-MIHAMA* continued in the T1 head-end facility. A total of 629 metric tons of uranium have been sheared to date this year.

At the T7 vitrification facility, lines A and C are in operation; line B is on stand-by. 12 canisters of glass were produced this week. A total of 329 canisters of glass have been produced to date this year.

Work in the Moulinets Cove

Work continues on modifications to the discharge pipe in the tidal basin:

  • radiological monitoring of sediments has revealed no anomalies, although there are fluctuations close to the old discharge pipe;
  • underwater excavation of the second section continued;
  • a new support seat was installed.


* Japanese PWR reactor